25th span of Padma Bridge installed
8 || risingbd.com
Published: 11:13, 21 February 2020
Update: 15:18, 26 July 2020
The 25th span of the Padma Bridge has been installed at the Zajira point in Shariatpur district.
Following the installation, 3,750 meters of the much-talked Padma Bridge became visible.
The 5-e span was put on pillar no 29 and 30 of the bridge around 3:00pm on Friday.
Earlier, the 150-metre long span was taken to Zajira point around 9:00am, Dewan Abdul Kader, executive engineer of the bridge said.
Munshiganj/Ratan/Nasim
risingbd.com