PM opens Bangabandhu tunnel
News Desk || risingbd.com
Prime Minister Sheikh Hasina has inaugurated the much-anticipated Bangabandhu Sheikh Mujibur Rahman Tunnel constructed beneath the Karnaphuli River today.
She formally inaugurated the first underwater tunnel in Bangladesh and South Asia, built by China, at 11:40 am on Saturday (October 28).
The premier first unveiled a plaque on the west bank of river Karnaphuli at Patenga and after crossing the tunnel, she unwrapped another plaque at the south bank of the river at Anwara.
The nearly 10km-long tunnel, including approach road, constructed beneath river Karnaphuli between Patenga and Anwara upazila which was built at a cost of Taka 10,374 crore will be opened to vehicles from October 29.
It would connect the proposed Asian Highway with Dhaka-Chattogram-Cox’s Bazar Highway by reducing distance by 40km.
She will also open and lay foundation stones of some projects in Chattogram on the occasion.
The premier will also release a special commemorative postage stamp, opening day envelope and a special seal marking the inauguration of the first ever underwater road tunnel.
Sheikh Hasina, also Awami League president, will address a public rally on Korean EPZ (KEPZ) ground at Anwara today as a huge number of people including leaders and workers of the ruling Awami League and associate bodies are expected to attend it.
AL’s Chattogram south district unit is organizing the rally as a festive atmosphere is prevailing all over the district for the gala occasion.
In a press briefing on Thursday in Dhaka, Road Transport and Bridges Minister Obaidul Quader said 17,260 vehicles would be able to use the tunnel on a daily basis equating to some 7.6 million vehicles a year.
The tunnel would help increase the country’s annual GDP growth by 0.166pc, he added.
“The tunnel will also cut the distance among Chattogram city, the seaport and the airport as it will play a crucial role in making the economy more vibrant,” Quader said.
As per the project details, the length of the entire route is 9.39 kilometers (5.83 mi), with the tunnel making up 3.32 kilometers (2.06 mi) of the length while it’s diameter is 10.80 meters (35.4 ft).
It has been built at a cost of Taka 10,374 crore and of which around half is financed by the Exim Bank of China.
It will improve the Dhaka-Chittagong-Cox’s Bazar highway network. A Chinese company, China Communications Construction Company, constructed it.
Prime Minister Sheikh Hasina and Chinese President Xi Jinping inaugurated the construction site of the Karnaphuli Tunnel on October 14, 2017.
On 24 February 2019, Sheikh Hasina also inaugurated the tunnel boring phase.
The multilane tunnel route passes through the river close to Navy College on one side and Korean Export Processing Zone (KEPZ) and Karnaphuli Fertilizer Company (KAFCO) on the other.
It will also ease traffic congestion on two bridges over the Karnaphuli River.
Rezaul/AI